PileManager
Bored piling · site records · How it works

The day's paperwork, finished before the crew leaves site.

PileManager takes the forms your teams already fill in by hand — pile logs, daily production, diesel, material movement — and turns them into one checked, reportable record. Figures are worked out as they are typed, mistakes are caught on the spot, and management sees the position of the works the same evening.

  • Nothing added up twice — concrete volumes, overbreak, cycle times and fuel per working hour are calculated from the values already entered.
  • Errors caught at the source — levels in the wrong order, or a delivery that cannot balance, are flagged before the record is filed.
  • One click to a signed report — any record prints as a PDF, and the daily production report fills itself in from that day's pile logs.
  • Your own workspace — every company gets its own address and its own database. Nothing is shared, and your records are yours to export at any time.
Management view

One board, instead of five spreadsheets

Planned against completed piles by location and section, drilled metres per day, plant utilisation, delay reasons and concrete consumption — every figure built from the records the site has already entered. Choose a month, a bridge location or a section and the whole board follows.

  • No end-of-month compilation by hand
  • Prints as it stands, for the progress meeting
  • Every figure traces back to the report that produced it
Overview board showing progress by location, daily production, plant utilisation and fuel
Overview — filtered to the last quarter
The register

Every report, searchable, with its status on it

Filter by report type, date range, section, structure or pile number. Draft, submitted and approved are visible at a glance. Anything on the screen exports to CSV, and any single record prints as a signed PDF.

  • Records lock after the day closes — the hour is yours to set
  • Every edit is kept with its author and the time it was made
  • One report per planned pile, so nothing is filed twice
Report register with filters, statuses and calculated columns
Reports — Daily Piling Report register
On site

A form that does the arithmetic

The operator types what was measured. Depths, durations, theoretical volume, the difference against what was actually poured and the resulting overbreak appear as they go. The layout follows the paper form the crew already knows, section by section.

  • Works on a phone, a tablet or the site office PC
  • Soil layers, delivery slips and reinforcement as repeating rows
  • Saved as a draft first, submitted when the day is complete
Daily piling report form with calculated fields highlighted
Add report — Daily Piling Report
The forms

Built from the sheets your office already uses

Each report type is drawn from a real Excel form — the same headings, the same units, the same order — so there is nothing new for the crew to learn.

Daily Piling ReportOne record per pile: levels, times, soil profile, delivery slips, reinforcement and CSL tubes.
Daily Production ReportOne per day for the whole site: personnel, plant by company, HSE, quality, output and delays.
Diesel Consumption RecordIssued against consumed, per machine, with litres per working hour worked out for you.
Daily Material Movement ReportWhat came in, what went out, what moved between sites, and what arrived damaged.

Plans

Every plan carries all four report types, the board, PDF reports and a nightly backup. What changes is how many people and projects it covers.

Starter
49USD / month
  • 1 project
  • 5 users
  • All four report types
  • The overview board
  • PDF reports
  • Nightly backup
14 days free to try
Company
399USD / month
  • Unlimited projects
  • Unlimited users
  • Everything in Site
  • Your own domain
  • Priority support
14 days free to try

Workspaces are opened by hand so that the pile register and the bridge list are loaded before your crew signs in for the first time. Leave your details below and we will set yours up.

Ask for a workspace

Tell us about the works and we will open one, load your bridge list and pile register, and send the first sign-in to you. There is nothing to install.

We reply to every enquiry ourselves — no automatic mail. Or write to destek@pilemanager.com.

How a day runs

1 Record The crew fills in the day's reports as the work happens — one per pile, one per day for production, diesel and material.
2 Check Formulas and consistency rules run while they type. A record that cannot be right is not accepted.
3 Report Management opens the board, or receives the daily summary as a PDF by email.
By Ventralia · © 2026 Ventralia. All rights reserved.